" Skip to main content

Project: Penn Medicine Radnor


Project Name: Penn Medicine Radnor
Location: 145 King of Prussia Rd, Radnor, PA
Market: Healthcare / Medical Office Building
Application: Building Heat
Mechanical Engineer: Stantec Architecture & Engineering, LLC
Mechanical Contractor: AT Chadwick Co, Inc
Sheet Metal Contractor: Aerdux Inc

Equipment:
• Two Fulton Endura Plus Model EDR-6000 Hydronic Condensing Boilers
• Schebler Model EVD Double Wall Exhaust Pipe

Download PDF

In the Spring of 2020, Penn Medicine opened a state-of-the-art, four story, 250,000 sq/ft multispecialty outpatient facility in Radnor, PA. This new location replaced its facility in the Township which was operated since 1997. The facility will provide comprehensive cancer care, including newly available radiation oncology services and chemotherapy provided by the Abramson Cancer Center, as well as primary care, heart and vascular, orthopedic and neuroscience care. Additional service includes same-day surgery, with six operating rooms and four endoscopy suites, along with full radiology and laboratory services. Patients will also have access to cutting-edge Penn Medicine clinical trials, expanding access to more patients without having to travel into Philadelphia.

Through their relationship with the projects mechanical engineer, Stantec, and Mechanical Contractor, AT Chadwick, UEP Northeast furnished (2) Fulton Endura 6000 MBH high-efficiency condensing boilers. These hydronic boilers will provide building heat as well as snow melt in critical areas of the facility. We also worked with sheet metal contractor, Aerdux, to provide Schebler double wall piping to vent the boilers products of combustion to the atmosphere.

Next Post
UEP Northeast

Author UEP Northeast

More posts by UEP Northeast

Leave a Reply